Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com

8' Deep, 4' foot wide, for temp water line. Waterline is already in the trench in this picture

Digging drenches, installing culverts, building drain swales, or digging out for footings, etc.

Here in Lakes area MN, the coil lines should be placed 8-10 ft. down. We will use an excavator and/or dozer to complete the dig

We can work with your Geothermal and HVAC/Plumbing Contractors to meet the requirements for your situation.
Copyright © 2026 Rydell Excavating - All Rights Reserved.
Phone: (218) 325-0140